| Singal Waveform |

Specification Temperature [°C (°F)] Resistance (kΩ) -40 (-40) 40.93 - 48.35 -30 (-22) 23.
Circuit Diagram [M/T] [A/T] Harness Connector
Inspection Operating Logic Test (Manual only) Inspect the PTC operation by confirmation logic as follows; 1. Entering (1) Set the Floor mode and maximum heating position. (2) Turn off the blower switch.
Inspection 1. Connect the battery voltage and check the blower motor rotation. 2. If the blower motor does not operate well, substitute with a known-good blower motor and check for proper operation.